Acceptance of new equipment in factory
1. SDR stage
2. FAT stage
3. SAT stage
From the equipment stage, the equipment guides the supplier to prepare and manufacture according to the safety requirements and standards, and the equipment enters the factory to meet the EHS safety requirements of the group.
Lihong Safety Equipment Engineering (Shanghai) Co., Ltd.
E-Mail: info@lh-safety.com
Address: Address: Floor 1, Building 1, No.2816 Yixian Road, Baoshan District, Shanghai
Copyright © Lihong Safety Equipment Engineering (Shanghai) Co., Ltd. ICP19034341-1 Technical Support: lanjujing